Work documentation
TEXAIR is a full cycle company capable of controlling the entire production process, from the design stage
all the way to the shipping of the finished products.
We create a full package of work documentation for our customers. The customer receives a working draft of the designed air duct system and after it is approved, the order is sent into production. Supplied along with the finished products is the work project: overall view (Fig. 1), a 2D or 3D work draft with sectional drawings indicating the location of perforation, the direction of air flows and materials specification (Fig. 2-3-etc.), and an assembly guide (Fig. 4).
Fig. 1: overall view
Fig. 2: 2D or 3D work draft with sectional drawings indicating the location of perforation, the direction of air flows and materials specification
Fig. 3: 2D or 3D work draft with sectional drawings indicating the location of perforation, the direction of air flows and materials specification
Fig. 4: assembly guide